Quarterly service — rooftop unit RTU-3
Completed 26 Aug 2026 at Meridian Tower, Seattle, and signed on site by the building engineer.
Bill this visit
Labour at the Meridian FM contract rate, plus the parts drawn on site.
- Labour$715.00
6h 30m on site at $110/h — 12m over the 6h 18m quoted.
- Parts$482.10
4 lines drawn from van 12 stock, itemised below.
- Invoice total$1,197.10
Signed on site by Priya Raman
26 Aug · 15:48 · rated 5 of 5
Service report and refrigerant log attached
3 files · 1.6 MB
Add the customer PO
Meridian FM holds any invoice raised without one — the draft is safe to raise now, but it will not be paid until the number is here.
What happened on site
Coil cleaned, contactor and filter drier replaced, charge topped up, unit returned to automatic control.
- Done
Customer sign-off captured
26 Aug · 15:48 · Priya Raman, building engineer
Signed on site; rated the visit 5 of 5.
- Partial
Refrigerant charge low — 4 lb added
26 Aug · 14:12 · Dana Whitfield
Suction pressure read 108 psi against a 118 psi target before the top-up.
- Done
Contactor and filter drier replaced
26 Aug · 12:30 · Dana Whitfield
Pitted contacts on the original 40 A contactor; both parts drawn from van stock.
- Done
Technician on site
26 Aug · 09:18 · Dana Whitfield
Arrived 42 minutes after dispatch, inside the 60-minute P2 target.
- Done
Work order opened from the PM schedule
24 Aug · 06:00 · automation
Quarterly preventive maintenance for RTU-3 came due.
Parts drawn
From van 12 stock during the visit.
- Liquid line filter drier$128.40FD-164qty 1 × $128.40
- Contactor, 40 A 2-pole$64.90CT-40Aqty 1 × $64.90
- V-belt AX-38$44.30BLT-AX38qty 2 × $22.15
- Refrigerant R-410A, 4 lb$244.50R410A-4qty 1 × $244.50
Attachments
The report the invoice rests on.
service-report-wo-4182.pdf
412 KB · Dana Whitfield
rtu-3-nameplate.jpg
1.2 MB · Dana Whitfield
refrigerant-log-aug.csv
18 KB · Automation